Ash Pond Lining for Bhavnagar Energy Company Ltd
Bhavnagar Energy Company Ltd engaged The Indure Pvt Ltd for the installation of an ash pond lining solution to manage the disposal of ash safely.
Facing stringent environmental regulations and the potential for groundwater contamination, the company sought a reliable containment solution for its ash pond, covering 150,000 SQM.
The chosen 500-micron HDPE geomembrane offered excellent impermeability and resistance to environmental stressors. The installation process involved meticulous preparation and layering to ensure that the geomembrane formed an effective barrier against leachate.
As a result, the project successfully minimized environmental impact, ensuring that ash disposal complied with all regulatory requirements. This initiative reinforces Bhavnagar Energy’s commitment to sustainable energy practices.